A medium voltage distribution panel was installed, the load was planned and every line was numbered before commissioning.

Work carried out

  1. Site Survey and Project Design
  2. Low-Voltage Infrastructure and Extra-Low-Voltage (ELV) Infrastructure
  3. Installation and Commissioning of Data and Fire Alarm Systems
  4. Installation and Commissioning of Low-Voltage (LV) Distribution and Power Factor Correction Panels
  5. Installation of Lighting Systems and Electrical Components