Projects we have completed across Türkiye. Tap a city on the map to see every project there.
Details
Project details
The scope, the work carried out and the photos of every project.
01Project
Şırnak Cizre Maternity and Obstetrics Hospital
Venue
Şırnak
Location
şırnak
Year
2025
As part of the Cizre Maternity and Pediatrics Hospital project, we implemented the low-voltage infrastructure. We completed the termination, testing, and labeling of data lines. We also installed the infrastructure for TV and satellite systems and carried out fiber-optic cable terminations. Furthermore, by installing rack cabinets, we ensured that the systems operate on an organized, reliable, and sustainable infrastructure.
We modernized the electrical distribution infrastructure at the Ferçim facility by replacing the main distribution panel. We resolved faults identified in the existing electrical installation and carried out necessary line upgrades, ensuring the system operates more safely, efficiently, and without interruption.
As part of a project at the Radisson Blu Hotel, we carried out the electrical installation work for five rooms, which were created by reconfiguring an existing meeting space to suit its new intended purpose. We implemented the electrical infrastructure and installation systems required for these new areas, ensuring the work was completed to high professional standards and quality benchmarks.
We completed the turnkey electrical installation for Kümes Restaurant, located within the Kayseri Park Shopping Mall. As part of the project, we implemented an electrical infrastructure and internal wiring system tailored to the establishment’s specific needs, adhering to high standards of professional workmanship, safety, and quality. By ensuring the facility was fully prepared for operation, we delivered a reliable, well-organized, and long-lasting electrical infrastructure.
Work carried out
Site Survey and Project Design
Low-Voltage Infrastructure and Extra-Low-Voltage (ELV) Infrastructure
Installation and Commissioning of Data and Fire Alarm Systems
Installation and Commissioning of Low-Voltage (LV) Distribution and Power Factor Correction Panels
Installation of Lighting Systems and Electrical Components
At Kayseri Park Shopping Mall, tasks were carried out during the installation and commissioning phases of a Siemens-brand fire detection and alarm system. The project involved the assembly of system components, on-site implementation, and comprehensive system checks, ensuring that the fire safety infrastructure operates effectively and reliably.